1.

Compare and contrast topographic maps and site plans in a preliminary site survey context.

2.

Discuss the scope of a preliminary site survey.

3.

Discuss the importance of health and safety considerations in conducting a site survey.

4.

Explain how to coordinate a preliminary site survey with other on-site activities and stakeholders.

5.

Evaluate the factors considered in assessing site survey conditions for environmental impacts.

6.

Outline the key components of a survey schedule for a preliminary site survey.

7.

Describe the process of interpreting survey drawings in the context of construction planning.

8.

Outline the steps involved in preparing a preliminary site survey plan.

9.

Analyze the role of leveling activities in establishing baseline data for construction projects.

10.

Propose methods for ensuring accuracy and reliability in leveling measurements during a site survey.

11.

Discuss the procedure for establishing original ground level (OGL) in a preliminary site survey.

12.

Explain the significance of reference points in maintaining spatial accuracy during a site survey.

13.

Outline the steps involved in mobilizing survey resources for a preliminary site survey.

14.

Critique the elements typically included in a preliminary survey report.

15.

Recommend strategies for managing data collected during a preliminary site survey.