1.

Define the term "rainwater harvesting system" and explain its importance.

2.

Describe the role of gutters in a rainwater harvesting system.

3.

Explain how a benchmark is used as a reference point in construction drawings.

4.

Discuss the significance of scale in interpreting working drawings.

5.

Analyze the impact of incorrect slope in gutter installation.

6.

Outline the benefits of using a filtration system in a rainwater harvesting setup.

7.

Discuss the key components of a rainwater harvesting system shown in working drawings.

8.

Assess the importance of elevation marks in ensuring correct installation heights.

9.

Describe how section views are used to show internal details of a system.

10.

Outline the steps to establish reference points on a construction site.

11.

Discuss the use of extension lines in dimensioning working drawings.

12.

Explain the process of setting up control points on a construction site.

13.

Identify the flow direction symbols in a piping layout.

14.

Describe the purpose of a legend in working drawings.

15.

Justify the need for tolerance and fit measurements in detailed views.

16.

Outline the steps involved in interpreting a site plan for a rainwater harvesting system.

17.

Discuss how to maintain accuracy when using reference points during installation.

18.

Discuss the role of slope in pipeline installation for effective water flow.

19.

Explain the importance of protective coatings for exposed construction materials.

20.

Outline the steps involved in verifying dimensions on a working drawing.

21.

Discuss the role of sectional drawings in construction documentation.