1.

Explain the process of establishing grid lines for a building set out in substructure works.

2.

Describe the importance of accurate setting out in substructure works.

3.

Identify the key tools used for setting out substructure works.

4.

Outline the steps involved in marking out the foundation trenches.

5.

Compare different methods for setting out a building’s foundation.

6.

 Demonstrate how to use a theodolite for setting out purposes in substructure works.

7.

Discuss the potential errors in setting out and their impact on substructure works.

8.

Determine the correct procedure for aligning a building’s gridlines with reference points.

9.

Analyze the role of surveyors in the setting out of substructure works.

10.

Illustrate how to transfer building dimensions from drawings to the ground.

11.

Assess the accuracy of a building set out using conventional surveying techniques.

12.

Critique the use of GPS technology in modern building set out processes.

13.

Outline the key considerations for setting out on sloped terrain.

14.

 Justify the need for frequent checks during the setting out process.

15.

Outline the common issues faced during the setting out of substructures and propose solutions.

16.

Evaluate the effectiveness of different setting out tools in various site conditions.

17.

Illustrate how to use a total station for precise building set out.

18.

Explain how to ensure vertical alignment in setting out a building’s substructure.

19.

 Prepare a checklist for quality control during the set out of substructure works.